Brand Name: | HY |
Model Number: | 07 |
MOQ: | 1 piece |
Delivery Time: | 3 days |
Payment Terms: | Prepayment starting from 30% |
This quick-assembly double-storey container villa features an innovative inner corridor design, offering high-quality prefab housing ideal for camping sites, construction projects, and commercial applications. With low foundation cost investment, rainproof inner corridor, and B1-level fire protection, it provides a secure and efficient living/working solution.
Product Type | Double-layer Container House |
---|---|
Style | Multi Story |
Interior | Spacious with flexible partitioning |
Construction Material | Hot-rolled galvanized steel |
Environmental Certification | Yes |
Assembly Time | 7-15 days |
The innovative double-layer superimposed design vertically expands usable space, effectively doubling the functional area within the same footprint. The first floor serves as public activity space (meeting rooms, dining areas), while the second floor provides private areas (bedrooms, offices), creating optimal spatial efficiency.
The internal corridor functions as the building's main artery, connecting all container units while maintaining their independence. Constructed with high-strength steel and fireproof boards, it ensures safe passage and material transport. Customizable with lighting strips and ventilation openings for enhanced interior environment.
Factory-prefabricated container modules include complete wall systems, doors/windows, and pre-installed utilities. Standardized interfaces enable rapid assembly using cranes and specialized tools, significantly reducing construction time, labor costs, and safety risks compared to traditional building methods.
Feature | Inner-Corridor Double-Decker Container | Traditional Buildings |
---|---|---|
Construction Cycle | 7-15 days (modular assembly) | Several months to years |
Spatial Flexibility | Freely divisible and combinable | Fixed structure, difficult to renovate |
Construction Cost | Lower (prefabricated production) | Higher (material and labor intensive) |
Environmental Impact | Recyclable materials, less waste | High resource consumption |
Mobility | Demountable, relocatable, reusable | Permanent, non-movable |
The interior space offers complete customization - lightweight partitions can be added or removed to create anything from open-plan areas to compartmentalized layouts. Perfect for creative office spaces, organized dormitories, or any application requiring flexible spatial solutions.
Brand Name: | HY |
Model Number: | 07 |
MOQ: | 1 piece |
Packaging Details: | Packaging of individual items |
Payment Terms: | Prepayment starting from 30% |
This quick-assembly double-storey container villa features an innovative inner corridor design, offering high-quality prefab housing ideal for camping sites, construction projects, and commercial applications. With low foundation cost investment, rainproof inner corridor, and B1-level fire protection, it provides a secure and efficient living/working solution.
Product Type | Double-layer Container House |
---|---|
Style | Multi Story |
Interior | Spacious with flexible partitioning |
Construction Material | Hot-rolled galvanized steel |
Environmental Certification | Yes |
Assembly Time | 7-15 days |
The innovative double-layer superimposed design vertically expands usable space, effectively doubling the functional area within the same footprint. The first floor serves as public activity space (meeting rooms, dining areas), while the second floor provides private areas (bedrooms, offices), creating optimal spatial efficiency.
The internal corridor functions as the building's main artery, connecting all container units while maintaining their independence. Constructed with high-strength steel and fireproof boards, it ensures safe passage and material transport. Customizable with lighting strips and ventilation openings for enhanced interior environment.
Factory-prefabricated container modules include complete wall systems, doors/windows, and pre-installed utilities. Standardized interfaces enable rapid assembly using cranes and specialized tools, significantly reducing construction time, labor costs, and safety risks compared to traditional building methods.
Feature | Inner-Corridor Double-Decker Container | Traditional Buildings |
---|---|---|
Construction Cycle | 7-15 days (modular assembly) | Several months to years |
Spatial Flexibility | Freely divisible and combinable | Fixed structure, difficult to renovate |
Construction Cost | Lower (prefabricated production) | Higher (material and labor intensive) |
Environmental Impact | Recyclable materials, less waste | High resource consumption |
Mobility | Demountable, relocatable, reusable | Permanent, non-movable |
The interior space offers complete customization - lightweight partitions can be added or removed to create anything from open-plan areas to compartmentalized layouts. Perfect for creative office spaces, organized dormitories, or any application requiring flexible spatial solutions.