Brand Name: | HY |
Model Number: | 04 |
MOQ: | 1 piece |
Delivery Time: | 3 work days |
Payment Terms: | Prepayment starting from 30% |
Attribute | Specification |
---|---|
Spray-painted Color | Black/White/Gray |
Plumbing | PVC/PEX/PPR |
Wall Panel Material | 75mm EPS Purification Board |
Frame Material | Hot-Dip Galvanized Frame |
Doors | Steel/Aluminum/Wood |
Thickness | 20-100mm |
Windows | Aluminum/PVC/Wood |
Wind Load | 50m/s |
Parameter Category | Parameter Details |
---|---|
External Dimensions (Expanded) | 5900mm × 6260mm × 2480mm |
External Dimensions (Folded) | 5900mm × 2200mm × 2480mm |
Wall Panel Material | 75mm EPS Purification Board |
Frame Material | Hot-Dip Galvanized Frame |
Spray-painted Color | Black/White/Gray |
Bathroom Configuration | Dry-Wet Separation with Independent Shower Room, Washbasin, Mirror Cabinet, Toilet, Shower Head, and Floor Drain |
Yes, the length can be adjusted between 3-12 meters, width between 2-6 meters, and height between 2-3 meters. The specific range depends on actual requirements and engineering feasibility.
The 75mm EPS purification boards provide excellent insulation performance in normal climates. For extreme weather conditions, additional auxiliary facilities may be recommended.
Standard-size container houses can be installed in 1-3 days. Complex customizations or combined installations may require additional time.
With proper maintenance, these container houses typically last 10-15 years. Regular inspections of the frame, doors/windows, and utility systems are recommended.
Relocation is straightforward with professional transportation. Preparation includes emptying contents, reinforcing vulnerable parts, and planning for utility reconnection at the new site.
Brand Name: | HY |
Model Number: | 04 |
MOQ: | 1 piece |
Packaging Details: | Packaging of individual items |
Payment Terms: | Prepayment starting from 30% |
Attribute | Specification |
---|---|
Spray-painted Color | Black/White/Gray |
Plumbing | PVC/PEX/PPR |
Wall Panel Material | 75mm EPS Purification Board |
Frame Material | Hot-Dip Galvanized Frame |
Doors | Steel/Aluminum/Wood |
Thickness | 20-100mm |
Windows | Aluminum/PVC/Wood |
Wind Load | 50m/s |
Parameter Category | Parameter Details |
---|---|
External Dimensions (Expanded) | 5900mm × 6260mm × 2480mm |
External Dimensions (Folded) | 5900mm × 2200mm × 2480mm |
Wall Panel Material | 75mm EPS Purification Board |
Frame Material | Hot-Dip Galvanized Frame |
Spray-painted Color | Black/White/Gray |
Bathroom Configuration | Dry-Wet Separation with Independent Shower Room, Washbasin, Mirror Cabinet, Toilet, Shower Head, and Floor Drain |
Yes, the length can be adjusted between 3-12 meters, width between 2-6 meters, and height between 2-3 meters. The specific range depends on actual requirements and engineering feasibility.
The 75mm EPS purification boards provide excellent insulation performance in normal climates. For extreme weather conditions, additional auxiliary facilities may be recommended.
Standard-size container houses can be installed in 1-3 days. Complex customizations or combined installations may require additional time.
With proper maintenance, these container houses typically last 10-15 years. Regular inspections of the frame, doors/windows, and utility systems are recommended.
Relocation is straightforward with professional transportation. Preparation includes emptying contents, reinforcing vulnerable parts, and planning for utility reconnection at the new site.